In recent days, a number of articles have been written about the WSP study. The document obtained from a tender was, however, corrupted. Now a better copy has become available, it will be posted here with all the appendices. The original articles (see related) are still relevant, and the link to the corrupted document has been replaced.
Related
The challenges of the topography in Molonglo 3 East and the staging of the Future Urban Area (FUA) is discussed here.
The importance of the intersection connecting Molonglo 3 East with William Hovell Drive and Bindubi Street is discussed here.
The East West Arterial / bridge and the C10 City to Molonglo Cycleway is discussed here.
The Molonglo 3 East Planning and Infrastructure Study and the reports written by the consultant RobertsDay is discussed here.
The Molonglo 3 East Planning and Infrastructure Study and the reports written by the consultant WSP is discussed here.
The study and appendices
The Phase 1 of the Molonglo 3 East Planning and Infrastructure Study is made up of the main Outcomes Report, and appendices A to G. The Outcomes Report is dated March 2021 but the appendices are from May 2020.
The parts from the consultant WSP
Outcomes Report
Appendix A – Background Review
Appendix C – Options Report
Appendix D – Drawings
The drawings are found in two files.
Appendix E – Transport Modelling Report
Appendix F – Preliminary Transport Noise Impact Assessment
The parts from the consultant RobertsDay
Appendix B – Design Principles
Appendix G – Stakeholder Presentations
Contains FOUR workshops that took place between May and November 2020.