ACT Projects Pipeline 2022 -23

The ACT Projects Pipeline gives you and idea what the ACT Government (Major Projects Canberra) thinks will be coming up. For cycling there is not much new here, except the 2022 ACT Household Travel Survey has officially started, 5 years after the last survey. Good news.

Never heard of it? It is worth knowing about. TCCS announcements are few and far between.

Contents

  1. Highlights
  2. Where is it up to now?
  3. The Blurb
  4. Major Projects pipeline 2022-23
  5. Definitions
  6. Major Projects pipeline 2021-22

Highlights

More interesting projects

  • 2022 ACT Household Travel Survey
  • Greenway Boardwalk and Path Network: Engineering Consultancy Services
  • Gungahlin Region Mesoscopic Reference Traffic Model
  • Garden City Cycle Route Feasibility and design

Estate developments

Three estate developments are currently under construction after a quiet year in 2021.

  • Jacka 2, stage 1A, 1B and 1C
  • Lawson 2, stage 2A
  • Whitlam, stage 3B
Whitlam update. ACT Government Suburban Land Agency presentation, Molonglo Valley Community Forum, 18 March 2021
Stage 1 and 2 are completed. Whitlam update. ACT Government Suburban Land Agency presentation, Molonglo Valley Community Forum, 18 March 2021
Whitlam slippage. Deep Creek Pond EIS, Whitlam, Molonglo Valley, 2021, 38.
Whitlam slippage. Deep Creek Pond EIS, Whitlam, Molonglo Valley, 2021, 38.

Where is it up to now?

The answer to how your favourite cycle infrastructure project is progressing. The data in this table is aggregated from many sources.

ProjectLast stage finishedWhen finishedNext stageBegunExpected completion dateWhat is after thatPriority completion dateFirst discussed
Sulwood Drive pathFeasibility study14 Apr 2021Detail designyes Budget Tender Construction20254/02/2003
Lake Ginninderra pathFeasibility study30 Nov 2021Detail designno Budget Tender ConstructionRequires
pedestrian bridge
2030s
ACT Election Oct 2020
Garden City Cycle RouteFrameworkDec 2018Feasibility studyYesJune 2023Detail design Budget Tender Construction2026-2028 2004
5 m shared path on Commonwealth
Bridge
Tender2022Detailed designnoJuly
2023
ConstructionJune 20252017
Compiled by canberra.bike. Last updated 19 March 2022.

The Blurb

The Projects Pipeline contains a register of planned procurement activities required to deliver the ACT Government’s budget funded capital works program.

The Project Pipeline is limited to construction related procurement opportunities. Tenders ACT contains a list of non-construction related forecast procurements, primarily for goods and/or services.

The Project Pipeline is aligned with the ACT Government Budget Process. There may be confidentiality requirements which impact the ability for procurement information to be published on the Project Pipeline.

ACT Projects Pipeline, Major Projects Canberra, ACT Government, accessed 20 April 2022.

Major Projects pipeline 2022-23

Unless the contract type is “construction” nothing is being built yet. The term “estate development” could mean different things but likely construction of services and road for the SLA. The rough sequences is:

  1. feasibility study
  2. detailed design
  3. construction
Procurement PackageTypeTotal Project Value ($)Indicative Procurement Package Value ($)Indicative Procurement Package Start Date
William Hovell Dr Duplicationconstruction50-100mTBAQ1 2023
Athllon Drive Duplication (North)detailed design50-100m0.5-2mSep 22
Throsby District Playing Fieldsconstruction15-20m15-20mJul 22
Jacka 2 Stage 1C estate developmentNFPNFPMay-22
Jacka 2 Stage 1Bestate developmentNFPNFPMay-22
Whitlam Stage 3B estate developmentNFPNFPApr 22
Jacka 2 Stage 1A estate developmentNFPNFPApr 22
Lawson 2 Stage 2Aestate developmentNFPNFPApr 22
2022 ACT Household Travel Surveyconsulting services0.5-2m0.5-2mApr 22
Greenway Boardwalk and Path Network consulting servicesNFP0.25-0.5mApr 22
Athllon Drive Duplication (South)detailed design50-100m0.5-2mApr 22
Jacka 2 consulting servicesNFP0.5-2mApr 22
Lawson 2 Stage 2A Estate consulting servicesNFP0.4 – 0.6 mApr 22
Gungahlin Region Mesoscopic Reference Traffic Modelconsulting services0.25-0.5m0.25-0.5mMar-22
Garden City Cycle Route Feasibility and designconsulting services0.5-2m0.5-2mMar-22
ACT Projects Pipeline, Major Projects Canberra, ACT Government, accessed 20 April 2022.

Definitions

Total Project Value ($): The value range for the delivery of the entire project. This will include government delivery costs, insurances, levies, consultant fees, design fees and construction fees. This figure is included as a guide.  Where the Territory is currently unable to identify a Project Value it is identified as ‘NFP’ (Not For Publication).

Indicative Procurement Package Value ($): The value range for the procurement package of planned as part of the project. Where the Territory is currently unable to identify a Indicative Package Value it is identified as ‘NFP’ (Not For Publication).

Prequalification Level (Financial): Indicative Prequalification Financial Level associated with the procurement

Prequalification Category: Indicative Prequalification Category(ies) associated with the procurement

Procurement Approach: Describes how the Territory will approach the market. Options are:

– Open: The package will be advertised on Tenders ACT
– Panel: The package will be released under an existing or new panel
– Select: The package will be released to a select group of suppliers
– REOI: Request for Expression of Interest will be called to enable short-listing of Suppliers
– Various: Primarily used for programmes of works with multiple small procurements which may be released as a mixture of Open, Panel or Select tenders
– TBA: the procurement approach is not known
– (IB) indicates an Industry Briefing will be held in advance or as part of the procurement process.

Category of Work: The type of services being procured.

District: The primary District within which any physical work will occur.

Project Type: The primary type of infrastructure being delivered.

Lead Agency: The ACT Government Directorate responsible for the delivery of the Project.

Indicative Procurement Package Start Date: The indicative date the procurement package will be released to market.

Released to Market: Whether the procurement activity has commenced.

ACT Projects Pipeline, Major Projects Canberra, ACT Government, accessed 20 April 2022.

Major Projects pipeline 2021-22

An interesting list of upcoming projects in the ACT in 2021-2022 (stand 20 Jul 2021), including the new suburbs of Jacka (Gungahlin) and Whitlam (Molonglo Valley), and duplications such as Athllon Drive. The list is sorted by procurement start. Indicative package values are included for most projects (others are marked Not For Publication ie NFP)

Despite package values of less than $0.5 million, there are no cycling projects in this list. Any major cycling project planned in 2021-2022 should be found here. The list was update long after the 2020 ACT Election. As far as cycling is concerned, this cannot be seen in a positive light.

Project TitleTotal Project Value ($)Indicative Package Value ($)Contract TypeProcurement Start
Monaro Highway – Early Works and Utilities100-250m5-10mConstructionJul-21
Molonglo High Voltage Relocation Consultancy ServicesNFPNFPConsultantJul-21
Whitlam Stage 3A – Residential Estate DevelopmentNFPNFPConstructionJul-21
Whitlam 3 – Engineering Consultancy ServicesNFP0.5-2mConsultantJul-21
Monaro Highway – David Warren Road100-250m2-5mDesignAug-21
Athllon Drive Duplication Detailed Design (x2)Programme2-5mConsultantAug-21
Active Street for Schools0.5-2m0.25-0.5mConstructionAug-21
Mawson Drive Improvements0.5-2m0.25-0.5mConstructionAug-21
Raising London Circuit – Main Works250m+50m+ConstructionSep-21
Molonglo River Bridge – Construction100-250m50m+D&CSep-21
Dickson Streetscape Design DevelopmentProgramme2-5mConstructionSep-21
Traffic Signal Improvements0.5-2m0.25-0.5mConstructionSep-21
Jacka 2 – Stage 1A – Residential Estate DevelopmentNFPNFPConstructionSep-21
Jacka 2 – Engineering Consultancy ServicesNFP0.5-2mConsultantSep-21
Whitlam Stage 3C – Residential Estate DevelopmentNFPNFPConstructionSep-21
East Gungahlin High School supporting road infrastructureProgramme5-10mConstructionOct-21
Braddon Streetscape Design DevelopmentProgramme2-5mD&COct-21
Jacka 2- Stage 1B – Residential Estate developmentNFPNFPConstructionOct-21
Jacka 2 – Stage 1C – Residential Estate DevelopmentNFPNFPConstructionNov-21
Whitlam Stage 3B – Residential Estate DevelopmentNFPNFPConsultantJan-22
Monaro Highway – Lanyon Drive Intersection100-250m50m+D&CFeb-22
Greenway Pedestrian Bridge and Path Network (2017-05-17)NFPNFPConstructionFeb-22
Greenway Pedestrian Bridge and Path Network – Engineeing Consultancy ServicesNFP0.25-0.5mConsultantFeb-22
Traffic Modelling for Parkes Way and South West Corridor (Tuggeranong Parkway)0.5-2m0.5-2mDesignTBA
Source: ACT Projects Pipeline selected projects, stand 20 Jul 2021, accessed 7 October 2021.

Leave a Comment

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s