The ACT Projects Pipeline gives you and idea what the ACT Government (Major Projects Canberra) thinks will be coming up. For cycling there is not much new here, except the 2022 ACT Household Travel Survey has officially started, 5 years after the last survey. Good news.
Never heard of it? It is worth knowing about. TCCS announcements are few and far between.
Contents
- Highlights
- Where is it up to now?
- The Blurb
- Major Projects pipeline 2022-23
- Definitions
- Major Projects pipeline 2021-22
Highlights
More interesting projects
- 2022 ACT Household Travel Survey
- Greenway Boardwalk and Path Network: Engineering Consultancy Services
- Gungahlin Region Mesoscopic Reference Traffic Model
- Garden City Cycle Route Feasibility and design
Estate developments
Three estate developments are currently under construction after a quiet year in 2021.
- Jacka 2, stage 1A, 1B and 1C
- Lawson 2, stage 2A
- Whitlam, stage 3B


Where is it up to now?
The answer to how your favourite cycle infrastructure project is progressing. The data in this table is aggregated from many sources.
Project | Last stage finished | When finished | Next stage | Begun | Expected completion date | What is after that | Priority completion date | First discussed |
Sulwood Drive path | Feasibility study | 14 Apr 2021 | Detail design | yes | Budget Tender Construction | 2025 | 4/02/2003 | |
Lake Ginninderra path | Feasibility study | 30 Nov 2021 | Detail design | no | Budget Tender Construction | Requires pedestrian bridge 2030s | ACT Election Oct 2020 | |
Garden City Cycle Route | Framework | Dec 2018 | Feasibility study | Yes | June 2023 | Detail design Budget Tender Construction | 2026-2028 | 2004 |
5 m shared path on Commonwealth Bridge | Tender | 2022 | Detailed design | no | July 2023 | Construction | June 2025 | 2017 |
The Blurb
The Projects Pipeline contains a register of planned procurement activities required to deliver the ACT Government’s budget funded capital works program.
The Project Pipeline is limited to construction related procurement opportunities. Tenders ACT contains a list of non-construction related forecast procurements, primarily for goods and/or services.
…
The Project Pipeline is aligned with the ACT Government Budget Process. There may be confidentiality requirements which impact the ability for procurement information to be published on the Project Pipeline.
ACT Projects Pipeline, Major Projects Canberra, ACT Government, accessed 20 April 2022.
Major Projects pipeline 2022-23
Unless the contract type is “construction” nothing is being built yet. The term “estate development” could mean different things but likely construction of services and road for the SLA. The rough sequences is:
- feasibility study
- detailed design
- construction
Procurement Package | Type | Total Project Value ($) | Indicative Procurement Package Value ($) | Indicative Procurement Package Start Date |
William Hovell Dr Duplication | construction | 50-100m | TBA | Q1 2023 |
Athllon Drive Duplication (North) | detailed design | 50-100m | 0.5-2m | Sep 22 |
Throsby District Playing Fields | construction | 15-20m | 15-20m | Jul 22 |
Jacka 2 Stage 1C | estate development | NFP | NFP | May-22 |
Jacka 2 Stage 1B | estate development | NFP | NFP | May-22 |
Whitlam Stage 3B | estate development | NFP | NFP | Apr 22 |
Jacka 2 Stage 1A | estate development | NFP | NFP | Apr 22 |
Lawson 2 Stage 2A | estate development | NFP | NFP | Apr 22 |
2022 ACT Household Travel Survey | consulting services | 0.5-2m | 0.5-2m | Apr 22 |
Greenway Boardwalk and Path Network | consulting services | NFP | 0.25-0.5m | Apr 22 |
Athllon Drive Duplication (South) | detailed design | 50-100m | 0.5-2m | Apr 22 |
Jacka 2 | consulting services | NFP | 0.5-2m | Apr 22 |
Lawson 2 Stage 2A Estate | consulting services | NFP | 0.4 – 0.6 m | Apr 22 |
Gungahlin Region Mesoscopic Reference Traffic Model | consulting services | 0.25-0.5m | 0.25-0.5m | Mar-22 |
Garden City Cycle Route Feasibility and design | consulting services | 0.5-2m | 0.5-2m | Mar-22 |
Definitions
Total Project Value ($): The value range for the delivery of the entire project. This will include government delivery costs, insurances, levies, consultant fees, design fees and construction fees. This figure is included as a guide. Where the Territory is currently unable to identify a Project Value it is identified as ‘NFP’ (Not For Publication).
Indicative Procurement Package Value ($): The value range for the procurement package of planned as part of the project. Where the Territory is currently unable to identify a Indicative Package Value it is identified as ‘NFP’ (Not For Publication).
Prequalification Level (Financial): Indicative Prequalification Financial Level associated with the procurement
Prequalification Category: Indicative Prequalification Category(ies) associated with the procurement
Procurement Approach: Describes how the Territory will approach the market. Options are:
– Open: The package will be advertised on Tenders ACT
– Panel: The package will be released under an existing or new panel
– Select: The package will be released to a select group of suppliers
– REOI: Request for Expression of Interest will be called to enable short-listing of Suppliers
– Various: Primarily used for programmes of works with multiple small procurements which may be released as a mixture of Open, Panel or Select tenders
– TBA: the procurement approach is not known
– (IB) indicates an Industry Briefing will be held in advance or as part of the procurement process.Category of Work: The type of services being procured.
District: The primary District within which any physical work will occur.
Project Type: The primary type of infrastructure being delivered.
Lead Agency: The ACT Government Directorate responsible for the delivery of the Project.
Indicative Procurement Package Start Date: The indicative date the procurement package will be released to market.
Released to Market: Whether the procurement activity has commenced.
ACT Projects Pipeline, Major Projects Canberra, ACT Government, accessed 20 April 2022.
Major Projects pipeline 2021-22
An interesting list of upcoming projects in the ACT in 2021-2022 (stand 20 Jul 2021), including the new suburbs of Jacka (Gungahlin) and Whitlam (Molonglo Valley), and duplications such as Athllon Drive. The list is sorted by procurement start. Indicative package values are included for most projects (others are marked Not For Publication ie NFP)
Despite package values of less than $0.5 million, there are no cycling projects in this list. Any major cycling project planned in 2021-2022 should be found here. The list was update long after the 2020 ACT Election. As far as cycling is concerned, this cannot be seen in a positive light.
Project Title | Total Project Value ($) | Indicative Package Value ($) | Contract Type | Procurement Start |
Monaro Highway – Early Works and Utilities | 100-250m | 5-10m | Construction | Jul-21 |
Molonglo High Voltage Relocation Consultancy Services | NFP | NFP | Consultant | Jul-21 |
Whitlam Stage 3A – Residential Estate Development | NFP | NFP | Construction | Jul-21 |
Whitlam 3 – Engineering Consultancy Services | NFP | 0.5-2m | Consultant | Jul-21 |
Monaro Highway – David Warren Road | 100-250m | 2-5m | Design | Aug-21 |
Athllon Drive Duplication Detailed Design (x2) | Programme | 2-5m | Consultant | Aug-21 |
Active Street for Schools | 0.5-2m | 0.25-0.5m | Construction | Aug-21 |
Mawson Drive Improvements | 0.5-2m | 0.25-0.5m | Construction | Aug-21 |
Raising London Circuit – Main Works | 250m+ | 50m+ | Construction | Sep-21 |
Molonglo River Bridge – Construction | 100-250m | 50m+ | D&C | Sep-21 |
Dickson Streetscape Design Development | Programme | 2-5m | Construction | Sep-21 |
Traffic Signal Improvements | 0.5-2m | 0.25-0.5m | Construction | Sep-21 |
Jacka 2 – Stage 1A – Residential Estate Development | NFP | NFP | Construction | Sep-21 |
Jacka 2 – Engineering Consultancy Services | NFP | 0.5-2m | Consultant | Sep-21 |
Whitlam Stage 3C – Residential Estate Development | NFP | NFP | Construction | Sep-21 |
East Gungahlin High School supporting road infrastructure | Programme | 5-10m | Construction | Oct-21 |
Braddon Streetscape Design Development | Programme | 2-5m | D&C | Oct-21 |
Jacka 2- Stage 1B – Residential Estate development | NFP | NFP | Construction | Oct-21 |
Jacka 2 – Stage 1C – Residential Estate Development | NFP | NFP | Construction | Nov-21 |
Whitlam Stage 3B – Residential Estate Development | NFP | NFP | Consultant | Jan-22 |
Monaro Highway – Lanyon Drive Intersection | 100-250m | 50m+ | D&C | Feb-22 |
Greenway Pedestrian Bridge and Path Network (2017-05-17) | NFP | NFP | Construction | Feb-22 |
Greenway Pedestrian Bridge and Path Network – Engineeing Consultancy Services | NFP | 0.25-0.5m | Consultant | Feb-22 |
Traffic Modelling for Parkes Way and South West Corridor (Tuggeranong Parkway) | 0.5-2m | 0.5-2m | Design | TBA |