18 years later and still not built!

We must remain sceptical of consultations. The consultation for (ACT) Ten Year Master Plan Trunk Cycling and Walking Path Infrastructure 2004, shows us that the recommendations have still not be implemented 18 years later. The process in 2004 has an eerie familiarity to the 2021 District Planning consultations.

Gradients in Molonglo 3: cycling from John Gorton Drive Bridge

Bicycles are arguably the most efficient machine ever invented, however, everything has its limits. A 30m section of steep path is all that is required to bring a cyclist to a stop. Pushing a bike up steep paths is not popular amongst cyclists. Better is to build the paths so that they are never so steep to become unrideable. Austroads Standards tell us how. Hilly terrain requires careful route and path design.

Aranda CBR Cycle Route C5: falling short of expectations

The ongoing saga of Aranda bike path. Maintenance is sorely needed but despite the newest promises nothing had been done. ACT Labor’s cycling ambition is underwhelming which leaves them on the back foot and it takes years to organise routine maintenance. Here is an example.

Section 2.1 The UK approach to network design

We cannot make a baby without a baby-making machine.