Belconnen Town Centre Renewal

Belconnen Town Centre is approach 50 years of age. Lake Ginninderra was finished in 1975. The Belconnen Town Centre followed shortly afterwards. We are familiar with the renewal of Woden Town Centre. Now we can expect a similar process with the renewal of Belconnen Town Centre. The first place making activities started in 2020 with the development of the Circus Area.

History of the Belconnen Bikeway

The need for better infrastructure in Belconnen Town Centre goes back a long way. Back in 2004, it was quite clear that the lack of cycle infrastructure in the Belconnen Town Centre need fixing. As the 2016 ACT Election rolled up, ACT Labor was finally prepared to do something about it. Delays followed. The original planned completion date of 2019 became the construction start date. With the arrival of the 2020 ACT Election, the project was still not completed, and the scope significantly reduced. It is now finished, in part.

18 years later and still not built!

We must remain sceptical of consultations. The consultation for (ACT) Ten Year Master Plan Trunk Cycling and Walking Path Infrastructure 2004, shows us that the recommendations have still not be implemented 18 years later. The process in 2004 has an eerie familiarity to the 2021 District Planning consultations.

Section 7.1 Feels like home

For a few years now, the ACT strategies have promoted a Movement and Place Framework. The idea, best shown in pictures, is difficult to put into practice, as it presumes the ACT Planning and Transport directorates work together.