200,000 people will soon live in Belconnen and Gungahlin, it is relatively flat, which gives the area great cycling potential. CBR Cycle Routes C11, C1 and C7 carve their way through the north, but not in ways that we would expect. Many grass reserves force the cyclist on huge detours. We still do not have a direct route between Belconnen and Mitchell. What are our options?
Tag Archives: C7
History of the Belconnen Bikeway
The need for better infrastructure in Belconnen Town Centre goes back a long way. Back in 2004, it was quite clear that the lack of cycle infrastructure in the Belconnen Town Centre need fixing. As the 2016 ACT Election rolled up, ACT Labor was finally prepared to do something about it. Delays followed. The original planned completion date of 2019 became the construction start date. With the arrival of the 2020 ACT Election, the project was still not completed, and the scope significantly reduced. It is now finished, in part.
CBR Cycle Route wayfinding signage
CBR Cycle Routes are motorways for cyclists, or at least that is the intent. You would know them as you would have ridden on one. Finally, they are getting wayfinding signage. It makes a difference.