The Territory Plan is part of the reason why good, fast cycling infrastructure between town centres for commuting cyclists – cycle highways – has not been and is not likely to be built. The ACT planning has been critiqued for hampering innovation. The comment, while likely directed at urban architecture, is still true for urban planning and design. Cycle highways are not possible without inclusion in statutory documents, such as the Territory Plan.
Tag Archives: Casey
40 km/h zone rollout confusion
Belconnen Town Centre has been trialling 40 km/h zones for over two years. The rollout to other town centre is causing confusion as commuters notice the changes.
Section 6.3 Cycle paths: planned but not built
The planning mechanism has systemic weakness. The Territory Plan shows that cycle paths are planned but not built. The Territory Plan is a statutory document.
North Gungahlin Structure Plan
Structure plans are different to concept plans, but it may not be obvious. Cycling is not mentioned much in the Territory Plan. Here are extracts from the North Gungahlin Structure Plan.
Cycling: Casey Concept Plan
Casey Concept Plan is found in the Territory Plan. Cycling in the Territory Plan is not mentioned all that often. Here are the extracts for Casey.