The Molonglo 3 East Planning and Infrastructure Study is a combination of engineering (WSP) and urban design (RobertsDay). The content related to cycling is largely found in the reports written by RobertsDay. RobertsDay is facilitating a Movement and Place framework discussion between ACT Transport and ACT Environment on the go. Molonglo 3 East project is about experimentation and innovation. The cycle network is still inconclusive but appears promising.
Tag Archives: Estate Development
Molonglo 3 East: topography
The topography of Molonglo 3 East demands a reframing of the way planning is done in the ACT. Best practices that apply to the Molonglo valley are not support by the Estate Development Code, Single and Multi-Unit Housing Development Codes and the zoning codes in the Territory Plan. Molonglo 3 East is something new and exciting that will push ACT planing towards an outcomes planning mechanism.
Molonglo 3 East: worth the wait
The Molonglo 3 East Future Urban Area (FUA) will be developed last, likely to be built from west to east. This will mean that the last suburb in the Molonglo Valley will be built within a kilometre from Molonglo Stage 1, where it all started. The irony of this is not lost on those who wish to cycle to Civic, as the most direct route would be through both these suburbs. Still, Molonglo 3 East is shaping up nicely and will be worth the wait.
Resetting ACT Planning
The complaints about the poor outcomes from the ACT Planning system have been discussed throughout the last legislative term, but without reform. Today, Planning Minister, Mick Gentleman, announced that the planning legislation will be rewritten.
Planning and Development Act 2007
The Planning and Development Act 2007 explains common urban planning terms in the ACT. Here is just a few.
Estate Development Code
This is the first of a series of articles on ACT building codes. The character and liveability of our city is a product of these codes. Here is a brief introduction to Estate Development Code and why it needs to be revised.
What RobertsDay has to say
The Estate Development Code and Molonglo 3 Stage 2 are a poor mix. The local terrain is working against the ACT Government. Something has got to give.
Molonglo Valley: much done, more to do
We all desire to be good parents, and one of the most common regrets is not having taken the time to do it better. The Molonglo Valley has come a long way since 2004, but will take as long again to complete. Those born in 2004 are likely to have children themselves before it is complete.
Active travel visual dictionary
Active travel contains an abundance of new terms. Here are some of the more common ones. The definitions are from the Active Travel Facilities Design – Municipal Infrastructure Standards 05 (MIS05).
Molonglo Valley: getting it right first time round
The Molonglo Valley is currently under construction and the cycling infrastructure is poor. If we wait until a suburb is finished then the problem will be with us for decades. This is what is happening now in the Molonglo Valley estate development.