Route options: CBR Cycle Routes C11, C1 and C7

200,000 people will soon live in Belconnen and Gungahlin, it is relatively flat, which gives the area great cycling potential. CBR Cycle Routes C11, C1 and C7 carve their way through the north, but not in ways that we would expect. Many grass reserves force the cyclist on huge detours. We still do not have a direct route between Belconnen and Mitchell. What are our options?

Section 7.1 Feels like home

For a few years now, the ACT strategies have promoted a Movement and Place Framework. The idea, best shown in pictures, is difficult to put into practice, as it presumes the ACT Planning and Transport directorates work together.

ACT Labor 2020 follow up

There was little cycling in the lengthy 2020 ACT Labor Policy Position Statement (no longer online) and most concerning was lack of specifics. ACT Labor did poorly on active travel in the 2016-2020 legislative term, however, seem to be doing better since. Minister Steel speech reaffirmed the pledges before the ACT Legislative Assembly (7 May 2022). This article compares ACT Labor’s progress on active travel between 2016-2020 and 2020-2022.

Analysis: ACT cycling investment just 1%

So much money is spent on roads. Here is a comparison of the investment in road improvement (duplications and widening) with other forms of transport. As cyclists, we are interested in bike paths, but the light rail is included, too.

History of the Flemington Road bike path

A blunder of urban planning resulted in a bike path disappearing from the map without the ACT Government noticing. The off-road bike path bypassing Mitchell on the Flemington Road was bulldozed to widen Flemington Road for the light rail. The ACT Government forgot to replace it and, after complaints, pledged to rebuild it. By July 2020 it was done.