The Territory Plan is part of the reason why good, fast cycling infrastructure between town centres for commuting cyclists – cycle highways – has not been and is not likely to be built. The ACT planning has been critiqued for hampering innovation. The comment, while likely directed at urban architecture, is still true for urban planning and design. Cycle highways are not possible without inclusion in statutory documents, such as the Territory Plan.
Tag Archives: Kingston Foreshore
40 km/h zone rollout confusion
Belconnen Town Centre has been trialling 40 km/h zones for over two years. The rollout to other town centre is causing confusion as commuters notice the changes.
Section 6.4 Language of structure plans
Structure plans are high level documents. The closest to planning strategy that can be found in the Territory Plan. Do the principles found in structure plans lead to better suburbs for cycling?
Kingston Foreshore Structure Plan
Structure plans are different to concept plans, but it may not be obvious. Cycling is not mentioned much in the Territory Plan. Here are extracts from the Kingston Foreshore Structure Plan.