PTCS Committee: cycle infrastructure and maintenance

The ACT Legislative Assembly has a number of standing committees that investigate (inquiry), record (transcript of evidence) and report (report). One annual inquiry is the Estimates. The Standing Committee On Planning, Transport And City Services (PTCS Committee) is one such committee. Here are the sections from their report relating to cycle infrastructure and maintenance.

568 km strategic bike paths managed by TCCS

False is the claim that we have 1000 km of bike paths in Canberra. Even with the most optimistic estimate, only 568 km of paths meets the minimum requirements for cycling, and the asphalt paths are about half that. In the ACT we have 327 km of bitumen paths, 235 km of concrete paths, and 6 km with pavers – total 568 km. In comparison, we have 5900 lane kilometres of roads.

TCCS maintenance targets compared

There are maintenance targets for roads and maintenance targets for paths. How do they compare? We need to distinguish between filling potholes and resurfacing. Resurfacing is better. Similarly, community paths can be repaired superficially, or resurfaced for replaced. Unlike roads, paths are quite thin and replacement and resurfacing are quite similar processes.

Gungahlin town centre and Yerrabi Ponds

On the 32nd anniversary of the first day of sitting of the Legislative Assembly, Active travel was discussed during question time. This time the topic was Gungahlin town centre. Below active travel in the hansard from 11 May 2021.

Analysis: ACT cycling investment just 1%

So much money is spent on roads. Here is a comparison of the investment in road improvement (duplications and widening) with other forms of transport. As cyclists, we are interested in bike paths, but the light rail is included, too.